Use the following simple method to assure the selection of the correct sizes of piping and tubing for LP-Gas vapour systems. Piping between first and second stage regulators is considered as well as low pressure (inches water column) piping between second stage, single stage or integral twin stage regulators and appliances.

Instructions:
  1. Determine the total gas demand for the system by adding up the BTU/hr input from the appliance nameplates, and adding demand as appropriate for future appliances.
  2. For second, single or integral twin stage piping.
  1. Measure length of piping required from the outlet of the regulator to the appliance furthest away. No other length is necessary to do the sizing.
  2. Make a simple sketch of the piping, as shown.
  3. Determine the capacity to be handled by each section of piping. For example, the capacity of the line between a and b must handle the total demand of all appliances A, B and C; the capacity of the line from c to d must handle only appliance B, etc.

  4. Using Table 4, select the proper size of tubing or pipe for each section of piping, using values in BTU/hr for the length determined from stem #2-A. If exact length is not on the chart use the next longer length. Do not use any other length for this purpose! Simply select the size that shows at least as much capacity as needed for each piping section.
  1. For piping between first and second stage regulators.
  2. For a simple system with only one second stage regulator, merely measure the length of piping required between outlet of of first stage regulator and inlet of second stage regulator. Select piping or tubing required from Table 1, 2 or 3.

Example 1

Determine the sizes of piping or tubing required for the single-stage LP-Gas installation shown.

Total piping length = 84 feet (use table 4 @ 90 feet)

From a to b, demand = 200,000 + 38,000 + 65,000 + 35,000 = 338,000 BTU/hr - Use 1 inch pipe
From b to c, demand = 38,000 + 65,000 + 35,000 = 138,000 BTU/hr - Use 3/4 inch pipe or 7/8" pipe
From c to d, demand = 65,000 + 35,000 = 100,000 BTU/hr - Use 3/4 inch pipe or 3/4" tubing
From d to e, demand = 35,000 = Use 1/2 inch piping or 5/8" tubing
From b to f, demand = 200,000 = Use 1 inch pipe
From c to g, demand = 38,000 = Use 1/2 inch pipe or 5/8" tubing
From d to h, demand = 65,000 = Use 1/2 inch pipe or 3/4" tubing

Example 2

Determine the sizes of piping or tubing required for the two stage LP-Gas installation shown.

Total first stage piping length = 26 feet; first stage regulation setting is 10 psig (use Table 1 or 3, @ 30 feet)

From a a to a, demand = 338,000 BTU /hr - Use 1/2 inch pipe, 1/2 inch tubing or 1/2 inch T plastic pipe.
Total second stage piping length = 58 feet (use Table 4, @60 feet)

From a to b, demand = 338,000 BTU /hr - Use 1 inch pipe
From b to c, demand = 138,000 BTU /hr - Use 3/4 inch pipe or 7/8" tubing
From c to d, demand = 100,000 BTU /hr - Use 1/2 inch pipe or 3/4" tubing
From d to e , demand = 35,000 = Use 1/2 inch pipe or 1/2" tubing
From b to f , demand = 200,000 = Use 3/4 inch pipe
From c to g , demand = 38,000 = Use 1/2 inch pipe or 5/8" tubing
From d to h , demand = 65,000 = Use 1/2 inch pipe or 5/8" tubing

Table 1 - First Stage Piping Sizing

Pipe or Tube Size in Inches Length in Feet 10 20 30 40 50 60 70 80 90 100
Copper (O.D) 3/8

1/2

5/8

3/4
558

1387

2360

3993
383

870

1622

2475
309

700

1303

2205
265

599

1115

1887
235

531

988

1672
213

481

896

1515
196

443

824

1394
182

412

767

1297
171

386

719

1217
161

365

679

1149
Pipe Size 1/2

3/4

1

1-1/4

1-1/2

2
3339

6982

13153

27004

40461

77924
2295

4799

9040

18560

27809

53556
1843

3854

7259

14904

22331

43008
1577

3298

6213

12756

19113

36809
1398

2923

5507

11306

16939

32623
1267

2649

4989

10244

15348

29559
1165

2437

4590

9424

14120

27194
1084

2267

4270

8767

13136

25299
1017

2127

4007

8226

12325

23737
961

2009

3785

7770

11642

22422

Pipe or Tube Size in Inches Length in Feet 125 150 175 200 225 250 275 300 350 400
Copper (O.D) 3/8

1/2

5/8

3/4
142

323

601

1018
130

293

546

923
118

269

502

843
111

241

467

790
104

235

438

740
90

222

414

700
89

211

393

664
89

201

375

634
82

185

345

584
76

172

321

543
Pipe Size 1/2

3/4

1

1-1/4

1-1/2

2
852

1780

3354

6887

10318

19871
772

1613

3039

6240

9349

18005
710

1484

2796

5741

8601

16564
660

1381

2601

5340

8002

15410
619

1296

2441

5011

7508

14459
585

1224

2305

4733

7092

13658
556

1162

2190

4495

6735

12971
530

1109

2089

4289

6426

12375
488

1020

1922

3945

5911

11385
454

949

1788

3670

5499

10591

Note:

Length of pipe is total length from outlet of first stage regulator to inlet of second stage regulator (or inlet of second stage regulator furthest away).
  1. To allow 2 PSIG pressure drop, multiply total gas demand by .707, and use capacities from table.
  2. For different first stage pressures, multiply total gas demand by the following factors, and use capacities from table.

    First Stage Pressure PSIG Multiply By
    20 0.844
    15 0.912

Table 2 - First Stage Piping Size

5 PSIG Inlet with 1 PSIG Pressure Drop
Maximum capacity of pipe or tubing, in thousands of BTU/hr of LP-Gas

Pipe or Tube Size in Inches Length in Feet 10 20 30 40 50 60 70 80 90 100
Copper (D.O) 3/8

1/2

5/8

3/4
454

938

1907

3334
312

644

1311

2291
251

518

1053

1840
215

443

901

1575
190

393

799

1396
172

356

724

1265
159

327

666

1163
148

304

619

1082
138

286

581

1015
131

270

549

959
Pipe Size 1/2

3/4

1

1-1/4

1-1/2

2
2946

6161

11605

23826

35699

68753
2025

4234

7976

16376

24536

47253
1626

3400

6405

13150

19703

37946
1392

2910

5482

11255

16863

32477
1233

2579

4859

9975

14946

28784
1118

2337

4402

9038

13542

26080
1028

2150

4050

8315

12458

23999
957

2000

3768

3768

7735

11590
897

1877

3535

7258

10875

20943
848

1773

3339

6856

10272

19783

Pipe or Tube Size in Inches Length in Feet 125 150 175 200 225 250 275 300 350 400
Copper (D.O) 3/8

1/2

5/8

3/4
116

239

486

850
105

217

441

770
97

199

405

709
90

185

377

569
84

174

354

619
80

164

334

584
76

156

318

555
72

149

303

529
66

137

279

487
62

127

259

453
Pipe Size 1/2

3/4

1

1-1/4

1-1/2

2
751

1571

2956

6076

9104

17533
681

1424

2682

5505

8249

15886
626

1310

2467

5065

7589

14615
583

1218

2295

4712

7060

13597
547

1143

2153

4421

6624

12757
516

1080

2034

4176

6257

12051
490

1026

1932

3966

5943

11445
468

978

1843

3784

5669

10919
430

900

1696

3481

5216

10045
400

837

1577

3238

4852

9345

Note:

Length of pipe is total length from outlet of first stage to inlet of second stage regulator (or inlet of second stage regulator furthest away).

To allow 2 PSIG pressure drop, multiply the total gas demand by .707, and use capacities from table

Table 3 - First Stage Plastic Tubing Sizing

10 PSIG Inlet with a 1 PSIG Pressure Drop
Maximum capacity of plastic tubing in thousands of BTU/hr of LP-Gas

Plastic Tube Size

NPS
SDR 10 20 30 40 50 60 70 80 90 100
1/2 T

1/2

3/4

1 T

1 T

1

1-1/4

2
7

9.33

11

11.5

12.5

11

10

11
1387

3901

7811

9510

10002

14094

24416

66251
954

2681

5369

6536

6874

9687

16781

45534
766

2153

4311

5249

5520

7779

13476

36566
655

1843

3690

4492

4725

6658

11534

31295
581

1633

3270

3981

4187

5901

11534

31295
581

1633

3270

3981

4187

5901

10222

27737
526

1480

2963

3607

3794

5346

9262

25131
484

1361

2726

3319

3490

4919

8521

23120
423

1188

2379

2897

3046

4293

7438

20181
399

1122

2248

2736

2878

4055

7026

19063

Plastic Tube Size

NPS
SDR 125 150 175 200 225 250 275 300 350 400
1/2 T

1/2

3/4

1 T

1 T

1

1-1/4

2
7

9.33

11

11.5

12.5

11

10

11
354

995

1992

2425

2551

3594

6226

16895
321

901

1805

2197

2311

3257

5642

15308
295

829

1660

2022

2126

2996

5190

14084
274

772

1545

1881

1978

2787

4829

13102
257

724

1449

1765

1856

2615

4531

12293
243

684

1369

1667

1753

2470

4280

11028
231

650

1300

1583

1665

2346

4064

11028
220

620

1241

1510

1588

2238

3878

10521
203

570

1141

1389

1461

2059

3567

9680
189

530

1062

1293

1359

1916

3318

9005

Total Length of piping from outlet of first stage regulator to inlet of second stage regulator or to an inlet of a second stage regulator furthest away.

Table 4 - Second, Single or Integral Stage Pipe Sizing

11 inches Water Column Inlet with a 1/2 inch Water Column Drop
Maximum capacity of pipe or tubing in thousands of BTU/hr of LP- Gas

Pipe or Tube Size in Inches Length in Feet 10 20 30 40 50 60 70 80 90 100
Copper (O.D) 3/8

1/2

5/8

3/4

7/8
49

110

206

348

536
34

76

141

239

368
27

61

114

192

296
23

52

97

164

253
20

46

86

146

224
19

42

78

132

203
-

38

71

120

185
-

36

67

113

174
-

33

62

105

161
-

32

59

100

154
Pipe Size 1/2

3/4

1

1-1/4

1-1/2

2
291

608

1146

2353

3525

6789
200

418

788

1617

2423

4666
161

336

632

1299

1946

3747
137

287

541

1111

1665

3207
122

255

480

985

1476

2842
110

231

435

892

1337

2575
102

212

400

821

1230

2369
94

198

372

764

1144

2204
87

185

349

717

1074

2068
84

175

330

377

1014

1954

Pipe or Tube Size in Inches Length in Feet 125 150 175 200 225 250 275 300 350 400
Copper (O.D) 3/8

1/2

5/8

3/4

7/8
-

-

-

-

-
-

-

-

-

-
-

-

-

-

-
-

-

-

-

-
-

-

-

-

-
-

-

-

-

-
-

-

-

-

-
-

-

-

-

-
-

-

-

-

-
-

-

-

-

-
Pipe Size 1/2

3/4

1

1-1/4

1-1/2

2
74

155

292

600

899

1731
67

141

265

544

815

1569
62

129

244

500

749

1443
58

120

227

465

697

1343
54

113

213

437

654

1260
51

107

201

412

618

1190
48

101

191

392

587

1130
46

97

182

374

560

1078
43

89

167

344

515

992
40

83

156

320

479

923

Total Length of piping from outlet of regulator to appliance furthest away.

All Table Data Calculated per NFPA #54 & 58