Use the following simple method to assure
the selection of the correct
sizes of piping
and tubing for LP-Gas vapour
systems. Piping
between first and second stage
regulators
is considered as well as low
pressure (inches
water column) piping between
second stage,
single stage or integral twin
stage regulators
and appliances.
Instructions:
- Determine the total gas demand for the system
by adding up the BTU/hr input
from the appliance
nameplates, and adding demand
as appropriate
for future appliances.
- For second, single or integral twin stage
piping.
- Measure length of piping required from the
outlet of the regulator to
the appliance
furthest away. No other length is necessary to do the sizing.
- Make a simple sketch of the piping, as shown.
-
Determine the capacity to be handled by each
section of piping. For example,
the capacity
of the line between a and b
must handle the
total demand of all appliances
A, B and C;
the capacity of the line from
c to d must
handle only appliance B, etc.
- Using Table 4, select the proper size of
tubing or pipe for each section
of piping,
using values in BTU/hr for
the length determined
from stem #2-A. If exact length
is not on
the chart use the next longer
length. Do
not use any other length for
this purpose!
Simply select the size that
shows at least
as much capacity as needed
for each piping
section.

- For piping between first and second stage
regulators.
- For a simple system with only one second
stage regulator, merely measure
the length
of piping required between
outlet of of first
stage regulator and inlet of
second stage
regulator. Select piping or
tubing required
from Table 1, 2 or 3.
Example 1
Determine the sizes of piping
or tubing required
for the single-stage LP-Gas installation
shown.

Total piping length = 84 feet (use table
4 @ 90 feet)
From a to b, demand = 200,000
+ 38,000 +
65,000 + 35,000 = 338,000 BTU/hr
- Use 1
inch pipe
From b to c, demand = 38,000
+ 65,000 + 35,000
= 138,000 BTU/hr - Use 3/4 inch
pipe or 7/8"
pipe
From c to d, demand = 65,000
+ 35,000 = 100,000
BTU/hr - Use 3/4 inch pipe or
3/4" tubing
From d to e, demand = 35,000
= Use 1/2 inch
piping or 5/8" tubing
From b to f, demand = 200,000
= Use 1 inch
pipe
From c to g, demand = 38,000
= Use 1/2 inch
pipe or 5/8" tubing
From d to h, demand = 65,000
= Use 1/2 inch
pipe or 3/4" tubing
Example 2
Determine the sizes of piping
or tubing required
for the two stage LP-Gas installation
shown.

Total first stage piping length = 26 feet;
first stage regulation setting is 10 psig
(use Table 1 or 3, @ 30 feet)
From a a to a, demand = 338,000
BTU /hr -
Use 1/2 inch pipe, 1/2 inch tubing
or 1/2
inch T plastic pipe.
Total second stage piping length
= 58 feet
(use Table 4, @60 feet)
From a to b, demand = 338,000
BTU /hr - Use
1 inch pipe
From b to c, demand = 138,000
BTU /hr - Use
3/4 inch pipe or 7/8" tubing
From c to d, demand = 100,000
BTU /hr - Use
1/2 inch pipe or 3/4" tubing
From d to e , demand = 35,000
= Use 1/2 inch
pipe or 1/2" tubing
From b to f , demand = 200,000
= Use 3/4
inch pipe
From c to g , demand = 38,000
= Use 1/2 inch
pipe or 5/8" tubing
From d to h , demand = 65,000
= Use 1/2 inch
pipe or 5/8" tubing
Table 1 - First Stage Piping Sizing
| Pipe or Tube Size in Inches |
Length in Feet |
10 |
20 |
30 |
40 |
50 |
60 |
70 |
80 |
90 |
100 |
| Copper (O.D) |
3/8
1/2
5/8
3/4 |
558
1387
2360
3993 |
383
870
1622
2475 |
309
700
1303
2205 |
265
599
1115
1887 |
235
531
988
1672 |
213
481
896
1515 |
196
443
824
1394 |
182
412
767
1297 |
171
386
719
1217 |
161
365
679
1149 |
| Pipe Size |
1/2
3/4
1
1-1/4
1-1/2
2 |
3339
6982
13153
27004
40461
77924 |
2295
4799
9040
18560
27809
53556 |
1843
3854
7259
14904
22331
43008 |
1577
3298
6213
12756
19113
36809 |
1398
2923
5507
11306
16939
32623 |
1267
2649
4989
10244
15348
29559 |
1165
2437
4590
9424
14120
27194 |
1084
2267
4270
8767
13136
25299 |
1017
2127
4007
8226
12325
23737 |
961
2009
3785
7770
11642
22422 |
| Pipe or Tube Size in Inches |
Length in Feet |
125 |
150 |
175 |
200 |
225 |
250 |
275 |
300 |
350 |
400 |
| Copper (O.D) |
3/8
1/2
5/8
3/4 |
142
323
601
1018 |
130
293
546
923 |
118
269
502
843 |
111
241
467
790 |
104
235
438
740 |
90
222
414
700 |
89
211
393
664 |
89
201
375
634 |
82
185
345
584 |
76
172
321
543 |
| Pipe Size |
1/2
3/4
1
1-1/4
1-1/2
2 |
852
1780
3354
6887
10318
19871 |
772
1613
3039
6240
9349
18005 |
710
1484
2796
5741
8601
16564 |
660
1381
2601
5340
8002
15410 |
619
1296
2441
5011
7508
14459 |
585
1224
2305
4733
7092
13658 |
556
1162
2190
4495
6735
12971 |
530
1109
2089
4289
6426
12375 |
488
1020
1922
3945
5911
11385 |
454
949
1788
3670
5499
10591 |
Note:
Length of pipe is total length
from outlet
of first stage regulator to inlet
of second
stage regulator (or inlet of
second stage
regulator furthest away).
- To allow 2 PSIG pressure drop, multiply total
gas demand by .707, and use
capacities from
table.
- For different first stage pressures, multiply
total gas demand by the following
factors,
and use capacities from table.
| First Stage Pressure PSIG |
Multiply By |
| 20 |
0.844 |
| 15 |
0.912 |
Table 2 - First Stage Piping Size
5 PSIG Inlet with 1 PSIG Pressure
Drop
Maximum capacity of pipe or tubing,
in thousands
of BTU/hr of LP-Gas
| Pipe or Tube Size in Inches |
Length in Feet |
10 |
20 |
30 |
40 |
50 |
60 |
70 |
80 |
90 |
100 |
| Copper (D.O) |
3/8
1/2
5/8
3/4 |
454
938
1907
3334 |
312
644
1311
2291 |
251
518
1053
1840 |
215
443
901
1575 |
190
393
799
1396 |
172
356
724
1265 |
159
327
666
1163 |
148
304
619
1082 |
138
286
581
1015 |
131
270
549
959 |
| Pipe Size |
1/2
3/4
1
1-1/4
1-1/2
2 |
2946
6161
11605
23826
35699
68753 |
2025
4234
7976
16376
24536
47253 |
1626
3400
6405
13150
19703
37946 |
1392
2910
5482
11255
16863
32477 |
1233
2579
4859
9975
14946
28784 |
1118
2337
4402
9038
13542
26080 |
1028
2150
4050
8315
12458
23999 |
957
2000
3768
3768
7735
11590 |
897
1877
3535
7258
10875
20943 |
848
1773
3339
6856
10272
19783 |
| Pipe or Tube Size in Inches |
Length in Feet |
125 |
150 |
175 |
200 |
225 |
250 |
275 |
300 |
350 |
400 |
| Copper (D.O) |
3/8
1/2
5/8
3/4 |
116
239
486
850 |
105
217
441
770 |
97
199
405
709 |
90
185
377
569 |
84
174
354
619 |
80
164
334
584 |
76
156
318
555 |
72
149
303
529 |
66
137
279
487 |
62
127
259
453 |
| Pipe Size |
1/2
3/4
1
1-1/4
1-1/2
2 |
751
1571
2956
6076
9104
17533 |
681
1424
2682
5505
8249
15886 |
626
1310
2467
5065
7589
14615 |
583
1218
2295
4712
7060
13597 |
547
1143
2153
4421
6624
12757 |
516
1080
2034
4176
6257
12051 |
490
1026
1932
3966
5943
11445 |
468
978
1843
3784
5669
10919 |
430
900
1696
3481
5216
10045 |
400
837
1577
3238
4852
9345 |
Note:
Length of pipe is total length
from outlet
of first stage to inlet of second
stage regulator
(or inlet of second stage regulator
furthest
away).
To allow 2 PSIG pressure drop,
multiply the
total gas demand by .707, and
use capacities
from table
Table 3 - First Stage Plastic Tubing Sizing
10 PSIG Inlet with a 1 PSIG Pressure
Drop
Maximum capacity of plastic tubing
in thousands
of BTU/hr of LP-Gas
Plastic Tube Size
NPS |
SDR |
10 |
20 |
30 |
40 |
50 |
60 |
70 |
80 |
90 |
100 |
1/2 T
1/2
3/4
1 T
1 T
1
1-1/4
2 |
7
9.33
11
11.5
12.5
11
10
11 |
1387
3901
7811
9510
10002
14094
24416
66251 |
954
2681
5369
6536
6874
9687
16781
45534 |
766
2153
4311
5249
5520
7779
13476
36566 |
655
1843
3690
4492
4725
6658
11534
31295 |
581
1633
3270
3981
4187
5901
11534
31295 |
581
1633
3270
3981
4187
5901
10222
27737 |
526
1480
2963
3607
3794
5346
9262
25131 |
484
1361
2726
3319
3490
4919
8521
23120 |
423
1188
2379
2897
3046
4293
7438
20181 |
399
1122
2248
2736
2878
4055
7026
19063 |
Plastic Tube Size
NPS |
SDR |
125 |
150 |
175 |
200 |
225 |
250 |
275 |
300 |
350 |
400 |
1/2 T
1/2
3/4
1 T
1 T
1
1-1/4
2 |
7
9.33
11
11.5
12.5
11
10
11 |
354
995
1992
2425
2551
3594
6226
16895 |
321
901
1805
2197
2311
3257
5642
15308 |
295
829
1660
2022
2126
2996
5190
14084 |
274
772
1545
1881
1978
2787
4829
13102 |
257
724
1449
1765
1856
2615
4531
12293 |
243
684
1369
1667
1753
2470
4280
11028 |
231
650
1300
1583
1665
2346
4064
11028 |
220
620
1241
1510
1588
2238
3878
10521 |
203
570
1141
1389
1461
2059
3567
9680 |
189
530
1062
1293
1359
1916
3318
9005 |
Total Length of piping from outlet
of first
stage regulator to inlet of second
stage
regulator or to an inlet of a
second stage
regulator furthest away.
Table 4 - Second, Single or Integral Stage
Pipe Sizing
11 inches Water Column Inlet
with a 1/2 inch
Water Column Drop
Maximum capacity of pipe or tubing
in thousands
of BTU/hr of LP- Gas
| Pipe or Tube Size in Inches |
Length in Feet |
10 |
20 |
30 |
40 |
50 |
60 |
70 |
80 |
90 |
100 |
| Copper (O.D) |
3/8
1/2
5/8
3/4
7/8 |
49
110
206
348
536 |
34
76
141
239
368 |
27
61
114
192
296 |
23
52
97
164
253 |
20
46
86
146
224 |
19
42
78
132
203 |
-
38
71
120
185 |
-
36
67
113
174 |
-
33
62
105
161 |
-
32
59
100
154 |
| Pipe Size |
1/2
3/4
1
1-1/4
1-1/2
2 |
291
608
1146
2353
3525
6789 |
200
418
788
1617
2423
4666 |
161
336
632
1299
1946
3747 |
137
287
541
1111
1665
3207 |
122
255
480
985
1476
2842 |
110
231
435
892
1337
2575 |
102
212
400
821
1230
2369 |
94
198
372
764
1144
2204 |
87
185
349
717
1074
2068 |
84
175
330
377
1014
1954 |
| Pipe or Tube Size in Inches |
Length in Feet |
125 |
150 |
175 |
200 |
225 |
250 |
275 |
300 |
350 |
400 |
| Copper (O.D) |
3/8
1/2
5/8
3/4
7/8 |
-
-
-
-
- |
-
-
-
-
- |
-
-
-
-
- |
-
-
-
-
- |
-
-
-
-
- |
-
-
-
-
- |
-
-
-
-
- |
-
-
-
-
- |
-
-
-
-
- |
-
-
-
-
- |
| Pipe Size |
1/2
3/4
1
1-1/4
1-1/2
2 |
74
155
292
600
899
1731 |
67
141
265
544
815
1569 |
62
129
244
500
749
1443 |
58
120
227
465
697
1343 |
54
113
213
437
654
1260 |
51
107
201
412
618
1190 |
48
101
191
392
587
1130 |
46
97
182
374
560
1078 |
43
89
167
344
515
992 |
40
83
156
320
479
923 |
Total Length of piping from outlet
of regulator
to appliance furthest away.
All Table Data Calculated per
NFPA #54 &
58
|
 |